Country evidence

Spain

Spain stands out for publishing transmission demand-access capacities and continuing to widen interconnection and renewable integration paths, giving projects better visibility than most peers.

Overall score

82 LeadingConclusion-first signal for new project interconnection readiness

Rank

#2Within the current editorial country set

Snapshot date

27 Mar 2026Country page and ranking use the same dated evidence package

Metric evidence

Score breakdown with source traceability

Reinforcement Momentum

Transmission expansion keeps pace with transition

Interconnection and renewable integration projects continue to widen usable network capacity.

82 / 100mixed
Why this score

Scored on visible reinforcement and the system's ability to keep integrating new renewable and load growth.

Interpretation

How to use this country page

Operator-focused reading guidance
  • Use the overall score to scan, then the metric notes to understand why it lands there.
  • Confidence flags matter most where direct access-capacity reporting is weak.
  • Read this as a new-project interconnection brief, not as a full grid resilience judgment.

Enablers

What currently supports faster connection

High-value positives
  • Demand-side transmission access capacities are now published by node
  • Large annual renewable additions continue to be absorbed
  • Interconnection programme is expanding with France and Portugal

Constraints

What still slows new projects

Structural or procedural bottlenecks
  • Some access information remains specialised and operator-centric
  • Regional bottlenecks still require reinforcement sequencing